We have had a lot of things going on this year, completely unrelated to the boat, which have slowed down the progress on Yebo.  It has been a difficult year to say the least but there has been some progress as you can see from the photos. 

We have our new corian countertops in the galley installed.  Justin made the countertops himself.  The stove and oven have been installed along with the gas lines.  All the cupboards/shelves throughout Yebo have been painted and are just waiting for me to pile some stuff on them!  All the fiberglass repairs are done throughout the interior and exterior.  All of the wood laminates are up in the cabins (still need 1 in salon) and we still have to do the trim and install doors to the cabins.  Two a.c. units are installed.  The breaker panel is in (wiring for 110 & 220 in progress), a couple of lights are in as well as the battery banks (engine and house).  Battery chargers are in.  We have all 6 mattresses ready to go in the cabins.  We still need cabin soles before we can move aboard and bilge pumps (6 of them) and plumbing for heads and galley.

We plan to move aboard before all is complete.  Finishing off the cabin countertops (laminates) and wiring, solar panels etc while living aboard. 

 

 

Up
Next